Approved Doc E Sound Testing - What's involved?

Airborne sound insulation test (walls & floors):  A controlled noise is generated by an amplifier and loudspeaker across a broad range of frequencies. The generated noise is very loud and can be in excess of 100dB. Initial measurements are taken using a Sound Level Meter within the ‘source room’ followed by further measurements in the ‘receiver room’ on the other side of the wall or floor under investigation. The source room speaker position is then changed and the measurements repeated either side of the partition under test.

Background noise measurements are made using a sound level meter in the receiving room and are used to apply appropriate corrections for external sound such as traffic noise. Similarly the reverberation time (the time taken for sound to decay by 60dB) is measured within the receiving room using the sound source and a sound level meter to determine the corrections that must be applied to account for the characteristics and absorptiveness of the room.

The difference in the two airborne noise levels (for walls and floors), corrected for background and reverberation characteristics determines the airborne sound insulation performance of the wall, or floor. A greater airborne noise difference between the source room and the receiver room determines a higher airborne sound insulation performance.

Impact sound transmission test (floors only):  This test is different, a calibrated ‘tapping machine’ which comprises of five 'hammers' driven up and down by a cam and electric motor is used to "tap" the floor surface by applying a known force on the floor structure. The machine is placed in several pre-determined positions. The resulting noise is measured in the dwelling below, using a sound level meter.

Background noise measurements are made using a sound level meter in the receiving room and are used to apply appropriate corrections for external sound such as traffic noise. Similarly the reverberation time (the time taken for sound to decay by 60dB) is measured within the receiving room using the sound source and a sound level meter to determine the corrections that must be applied to account for the characteristics and absorptiveness of the room.

The measured noise levels in the receiving room (for impact floors tests), corrected for background and reverberation characteristics determines the impact sound insulation performance of the floor. For the impact noise the lower the measured level, the better the performance as less sound is being transmitted into the dwelling below.

Find out more about Sound Testing or contact Soundguard Acoustics

Sound Test DEVON | Sound Test CORNWALL | Sound Test SOMERSET | Sound Test DORSET | Sound Test SOUTH WEST | Sound Test UK

Thursday, 24 January 2013

Where do I find an approved Sound Tester?



Approved Document E states that the sound insulation testing body should be either a member of the Association of Noise Consultants (ANC) and have joined their PCT registration scheme or be registered testers with the United Kingdom Accreditation Service (UKAS). 

Choosing an accredited company under these schemes gives you the peace of mind that your reports will be accepted by all local authorities, building control and national guarantee companies. 

By using an ANC member registered under the PCT registration scheme, such as Soundguard Acoustics Ltd, then you will receive a full report including instruction for your Building Control Officer for accessing the secure online testing certificates for your build. Soundguard Acoustics will also liaise with and release the report directly to your BCO if required.

For sound testing in the Southwest follow these links: SOUTHWEST | DEVON | SOMERSET



What if I use an unregistered company?

Don’t! The quality and validity of the testing and results may be questionable and may not be accepted by the necessary approval bodies. It is likely that your BCO will ask for further or repeated testing by an accredited test company to validate the results. This will result in delay for your project and further payment to the accredited test company.